Pioneer Trail Pipeline Project

Construction of New Pioneer Trail Pipeline and Pump Station

TDPUD will soon be restarting construction work on the Pioneer Trail Pipeline and Pump Station. This project began in September 2022, and will result in a new water pipeline and pump station to serve the Tahoe Donner area. This highly-anticipated water project is critical to the health of the community’s water service, and will strengthen the reliability of TDPUD’s water delivery system. 

The Pioneer Trail Pipeline Project involves the construction of a new water pipeline and a new pump station to serve the Tahoe Donner subdivision. The new pipeline will connect existing water piping on Northwoods Boulevard to a new pump station located to the southwest of the intersection of Pioneer Trail and Comstock Drive. This area is currently served by a single water pipeline along Northwoods Boulevard. The existing pipeline and the accompanying pump stations were constructed in the early 1970s and are approaching the end of their useful life. Construction of the new pipeline will provide redundancy within TDPUD’s water distribution system, and will give the district the ability to rehabilitate the existing facilities. TDPUD has not taken on a water project of this size and scope since 2008.

This project also improves TDPUD’s capacity and resiliency in providing potable water and fire flow into Tahoe Donner. Four fire hydrants will also be added to the Trout Creek Trail area. TDPUD will also be installing $1M of new primary power and communications conduits in a joint trench along with the water pipeline for future network build out. TDPUD also plans to repave the full width of the trail in areas that are disturbed by construction. Final determination of paving needs will be made after the installation of the pipe and conduit is complete.

Map of the Trout Creek Trail closure to allow for a pipeline construction project

Trout Creek Trail Closures

This work requires closures to the Trout Creek Trail, as it did last fall. TDPUD and the project contractor, C&D Construction, have spent much time figuring out the best way to approach this project in order to complete the work in this year’s shortened construction season, while also being mindful of our community’s use of this trail and attempting to have the least amount of impact during peak periods. Given this year’s big winter, crews have been delayed on starting the project until after Memorial Day. The work that remains on the project will take a few months. Recognizing that closing the trail during the height of the summer would be detrimental to the lives of many of our residents and visitors, TDPUD and the project contractor, C&D Contractors, have found a creative solution. The trail will close from approximately May 30-June 30, then reopen for July 4th weekend and remain open through Labor Day. It will then close again until work is finished in the fall. This plan balances the needs of the community with the needs of the utility, and will allow for the project to be completed without cutting off access to the trail during its busiest time of use.

During the closure, the Trout Creek Trail will be closed to all access from the trailhead at Northwoods Blvd, to about a half mile east of the Trout Creek Bridge. While a section of the trail starting from the trailhead in Downtown Truckee will remain open, the trail will not be passable from end to end. Access from Downtown Truckee to the Pioneer Commerce Center will remain unaffected.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer
Pioneer Trail Pipeline Project FAQ

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer